NWR KARBONIA Sp. z o.o. has been established in the year 1999 under the name of KARBONIA PL Sp. z o.o. Main activities within the company are focused on:
  • Exploration of underground coal and CBM resources
  • Mining and selling of minerals,
  • Methane production and sales,
  • Development and engineering
The company has customers on Polish and Czech site of the border. The brief history of company follows:

2000:

  • purchases, modernization and sales of processing plant equipment ,
  • purchase of 110/6 kV Pogwizdów substation,
  • obtained concession for exploration and extraction of methane from the coal bearing strata

2001:

  • obtained license for distribution and sales of electrical energy ,
  • drilled ‘Kaczyce 1/01’ exploratory/production borehole to the old workings in ‘Morcinek’ mine,
  • purchase of a 6kV low-voltage distribution network,

2002:

  • started supply of electricity to the buyers connected to 110/6 kV Pogwizdów
  • energy transit between GZE SA and BE SA
  • purchase of land and buildings on the former Morcinek site,
  • modernization of the 110 kV Pogwizdów substation and construction of 110kV power line to the state border

2003:

  • geological documentation of methane deposit “Kaczyce I ” has been approved by the Ministry of Environment ,
  • setting up tele-transmission systems to PSE SA requirements,
  • commenced sales of electrical energy to Darkov coal mine ,
  • increased power supply rating from 33 MW to 66MW for the 110 kV Pogwizdów substation ,
  • construction of a gas pipeline between the ‘Kaczyce 1/01’ borehole and the state border ,
  • license No. 13/2003/p dated October 30th, 2003 for coal exploration in ‘Morcinek 1’ mining district was obtained.

2004:

  • EU intra-community supply of electrical energy to a Czech buyer ,
  • supply of electrical energy to domestic buyers connected to ‘NWR KARBONIA Sp. z o.o.’ distribution network ,
  • electrical energy trade as a Member of Balancing Market and a Member of Network Interchange System,
  • construction of a 225 mm diameter, 2480 m long gas pipeline from ‘Kaczyce 1/01’ borehole to the state border,
  • sales of methane from the ‘Kaczyce 1/01’ borehole to a Czech buyer,
  • modernization of SE Pogwizdów substation – 3rd stage.

2005:

  • EU intra-community supply of electrical energy at 110 kV to a Czech buyer ,
  • supply of electrical energy to domestic buyers connected to NWR KARBONIA Sp. z o.o. power distribution network ,
  • electrical energy trade as a Member of Balancing Market and a Member of Network Interchange System ,
  • supply of methane from ‘Kaczyce 1/01’ borehole to a Czech buyer ,
  • supply of methane from ‘Kaczyce 1/01’ borehole to domestic buyers ;
  • modernization of SE Pogwizdów substation – 4th stage.

2006:

  • EU intra-community supply of electrical energy at 110 kV to a Czech buyer,
  • supply of electrical energy to domestic buyers connected to NWR KARBONIA Sp. z o.o. power distribution network ,
  • electrical energy trade as a Member of Balancing Market and a Member of Network Interchange System ,
  • supply of methane from the ‘Kaczyce 1/01’ borehole to a Czech buyer ,
  • supply of methane from the ‘Kaczyce 1/01’ borehole to domestic buyers ,
  • modernization of SE Pogwizdów substation – 5th stage;

2007:

  • drilling of ‘Kaczyce 2/07’ exploration borehole to the depth of 1000 m, prepared geological documentation of ‘Dębieńsko 1’ coal deposit in A, B, C1 and C2 exploration category – approved by Ministry of Environment on August 31st, 2007 ,
  • supply of methane to a Czech buyer,
  • supply of electrical energy at 110 kV to a Czech buyer,
  • electrical energy trade as a Member of Balancing Market and a Member Network Interchange System .

2008:

  • obtained license No. nr 8/2008 dated June 24th, 2008 to mine coal and methane as the accompanying mineral from ‘Dębieńsko 1’ deposit area of 31,7 sq km,
  • prepared geological documentation of ‘Dębieńsko 2’ coal deposit in A, B, C1 and C2 exploration category – approved by the Ministry of Environment on November 7th, 2008,
  • obtained license No. nr 57/2008/p dated November 20th, 2008 for exploration of coal, coal bed methane and natural gas deposits in ‘Zebrzydowice 1’ mining district,
  • supply of methane to the Czech buyer – OKD, DPB, a. s ,
  • supply of electrical energy domestic buyers supply,
  • Setting-up NWR KARBONIA Sp. z o.o. Energy Service Company as a independent entity
  • opening of company office in Czerwionka-Leszczyny.

2009:

  • opening of company office in Katowice,
  • division of Karbonia PL Sp.z o.o. into two companies:
    • NWR Karbonia Sp. Z o.o.
    • NWR Energetyka Sp. Z o.o.